PTE1000P
RACK AND PINION HOIST FOR MATERIALS AND PERSONS
Basic Equipment Rack and Pinion Hoist for persons and materials three-phase
1 Transport Platform
1 Standard Tilting Anchorage
1 Anchorage Support
1 Cabel Guide
1 Floor Stop
1 Plug
1 Levelling tool
35 meters of electric cable
Model | PTE1000P |
---|---|
Type of Load | Materials and Persons |
Maximum Load | 1000 Kg |
Platform Length | 2.00 M |
Platform Width | 2.33 M |
Platform Height | 2.23 M |
Lifting Speed with Persons | 12 M/min |
Lifting Speed with Materials | 24 M/min |
Maximum Height | 150 M |
Motor Power | 8 Kw |
Power Supply | Three-phase |
Current Intensity | 20 A |
Weight of the Machine | 1100 Kg |
Model of Mast |